The detailed schedule for this weekend 8/17 - 18 depends on
the status of 2 systems: the BLAST power supply and the WC
TDCs.
If the power supply is operational, which will be known on
Friday, then Saturday day and evening will be devoted to
data taking with field on/off to establish rigorously the
effect of field on background and detector performance.
Tancredi has shift personnel scheduled for this if it should
occur.
If the WC/TDC noise problem is solved as well, the WC will
run in parallel with the detector studies and continue on
Sunday with field off.
If the WC/TDC noise problem is not solved by the end of Friday,
and the supply is not operational, the WC group will want the
hall open on Saturday and Sunday.
In either case, the nights will be used by the Compton polarimeter
for measurements with beam through the snakes and Sunday day and
evening will be used by the ABS group for measurements.
-- John R. Calarco Dept. of Physics Univ. of New Hampshire Durham, NH 03824 phone: (603)862-2088 FAX: (603)862-2998 email: calarco@unh.edu