Hello,
Continued to take wire target data through the night with the blast
field on. Saw a lot of nice clean tracks originating from the target.
The S/B was close to 3:1 or better for all the chamber throughout the
night. Here are the runs
Run Built Events
2159 101 K <-----Finished run
started by Chi and Tong
2160 100 K
2161 38K
One correction to Tong's message : Boxes R31(not 30) and L21 that
trip. Also R27 Sense does not hold the correct voltage a status of
"0101" is returned for that signal.
Adam
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST