Re: [BLAST_SHIFTS] 10/08/2002 day shift

From: Adrian T Sindile (asindile@cisunix.unh.edu)
Date: Tue Nov 12 2002 - 14:15:59 EST


Hi, Karen!
The orange wire was coming out from the 8th set of pins the day I
disconnected it. Then all the NC wires into the MLUs were disconnected, as
it looked like they were giving us trouble.
After that, we did not see missing TOF spectra anymore...

Adrian

-------------------------------
Adrian Sindile
Research Assistant
Nuclear Physics Group
University of New Hampshire
phone: (603)862-1691
FAX: (603)862-2998
email: asindile@alberti.unh.edu
http://einstein.unh.edu/~adrian/



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST