[BLAST_SHIFTS] runplan 11/19

From: Tancredi Botto (tancredi@mitlns.mit.edu)
Date: Tue Nov 19 2002 - 17:42:48 EST


1) To Measure effect of B-field on CC

_ Run the TOF_CC_10percent HV setting. All CC thresholds at 35 mV

_ Check for any DC offsets at the CC analogue input with beam on and
  eventually re-adjust the linear fifo offset. Make sure you get all
  channels back after you reconnect them.

_ Take data at 0, 1500, 3000, 4500 and 6730 A on the BLAST power supply,
  for a 0.2 SCCM target with the elastic_coincs.trigger.

Take 2 hrs runs

2) In parallel take data with the Wch, make sure the SH lights are off
   (ask CCR)

3) Take a long long empty target run

-- tancredi

________________________________________________________________________________
Tancredi Botto, phone: +1-617-253-9204 mobile: +1-978-490-4124
research scientist MIT/Bates, 21 Manning Av Middleton MA, 01949
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:28 EST