[BLAST_SHIFTS] runplan tomorrow 12/7 B shift

From: Tancredi Botto (tancredi@mitlns.mit.edu)
Date: Fri Dec 06 2002 - 16:48:53 EST


Tomorrow morning Compton measuraments (BF, GT) have priority. We should
start up parasitically and check our data and all of our systems.

If possible correct the HV db, making an educated guess of the proper
voltage for the two bad channels. Investigate the two bad pedestals
(light leaks ?) Update also the calibration file. Check the CC offsets.
The TS is in strobe mode. See also KD email.

Likewise, check and start up the Wch (tong will be in)

*** It is important not to touch the tdc offsets anymore***
Although these are offsets are not final our cuts depend crucially on
them.

The next steps will be:

1) We need about 1 shift of data from the unpol system at 0.5 SCCM in
   order to check our false asymmeytry.

2a) Then we should proceed with the cross calibration of the ABS flow with
    the unpol flow. Open the ABS valve, measure polarized gas

2b) If no ABS, we'll flow D2 and look for e,e'n

-- 
________________________________________________________________________________
Tancredi Botto,  		phone: +1-617-253-9204  mobile: +1-978-490-4124
research scientist		MIT/Bates, 21 Manning Av    Middleton MA, 01949
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^