Tomorrow morning Compton measuraments (BF, GT) have priority. We should
start up parasitically and check our data and all of our systems.
If possible correct the HV db, making an educated guess of the proper 
voltage for the two bad channels. Investigate the two bad pedestals
(light leaks ?) Update also the calibration file. Check the CC offsets. 
The TS is in strobe mode. See also KD email.
Likewise, check and start up the Wch (tong will be in)
*** It is important not to touch the tdc offsets anymore***  
Although  these are offsets are not final our cuts depend crucially on 
them.
The next steps will be: 
1) We need about 1 shift of data from the unpol system at 0.5 SCCM in 
   order to check our false asymmeytry. 
2a) Then we should proceed with the cross calibration of the ABS flow with 
    the unpol flow. Open the ABS valve, measure polarized gas
2b) If no ABS, we'll flow D2 and look for e,e'n
-- ________________________________________________________________________________ Tancredi Botto, phone: +1-617-253-9204 mobile: +1-978-490-4124 research scientist MIT/Bates, 21 Manning Av Middleton MA, 01949 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST