[BLAST_SHIFTS] A shift summary: 12.9.2; JS & OF

From: Jason Seely (seely@MIT.EDU)
Date: Mon Dec 09 2002 - 06:19:41 EST


took data with field on, WCh on, compton on, elastic_coincs trigger, ccr
flipped the spin each fill.

following nik and chi's recommendation from the previous shift, we took
1 run per fill to make sure that the compton daq didn't hang each time
we ramped the voltages. we had two coda hangs and one compton hang all
night. not too bad.

oh, transverse holding field was at ~272 A.

runs 3092-3109: 0.5 sccm, 30 mA beam, ~20k events per run

CCR stopped beam around 6:10 in order to open up the south hall by 6:30.

js of

--
--------------------------------------------------------------------
jason seely
26.650.b
massachusetts institute of technology
77 massachusetts avenue
cambridge, ma 02139-4307

email: seely@mit.edu phone: 617.253.4772/6734 html: web.mit.edu/seely/www --------------------------------------------------------------------