[BLAST_SHIFTS] runplan

From: Tancredi Botto (tancredi@mitlns.mit.edu)
Date: Wed Dec 11 2002 - 20:35:59 EST


Hi,
I assume tomorrow we should measure elastic with ABS flow and
unpol flow (need no be the same). The rate/C will provide the
best cross calibration of the true ABS flow (to the target)

We still have to collect false asymmetry data on the unpol target ( 1
shift) The holding field direction should be 45 deg, which is the max of
the asymmetry (check with CCR)

-- 
________________________________________________________________________________
Tancredi Botto,  		phone: +1-617-253-9204  mobile: +1-978-490-4124
research scientist		MIT/Bates, 21 Manning Av    Middleton MA, 01949
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST