Shift began with data taking for the asymmetry study.

Hall was open at 10am.

ABS problems continued throughout the day and no more data
was taken.

Start counter and small paddle were shielded with Mu Metal
and installed at in pit using tripods for a feasibility study of
the potential for extra scintillators upstream of the most backward
angle TOFs.