[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Jul 17 2003 - 15:36:05 EDT


Operators: ajmasch seely ----

this shift was plagued by HV problems. four times we had to go down to the d-tunnel to reset the hv crates. the problem is being looked into.

some tensor polarized data was taken but not much.