Operators: ajmasch seely ----
this shift was plagued by HV problems. four times we had to go down to the d-tunnel to reset the hv crates. the problem is being looked into.
some tensor polarized data was taken but not much.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST