[BLAST_SHIFTS] Shift summary

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Jul 19 2003 - 16:08:20 EDT


Operators: clasie seely ----

no beam until 2pm. ran tensor polarized deuterium.

runs:
1553 tensor -, waveplate out, 250 kevents (crunching)
1554 tensor -, waveplate out, 250 kevents (crunching)
1555 tensor +, waveplate out, 250 kevents (crunching)

problem from previous shift was being solved for most of the day. there was arcing in the polarized source. ccr changed the SF6 again and were able to start running.

6pole top and 6pole bottom alarms were disabled since they were continually high. this was per ET from previous shift. both were stable all day.
6pole top = 1.6e-6 (setpoint = 1.20e-6)
6pole bot = 3.9e-6 (setpoint = 3.08e-6)
stopped taking runs around 3:30pm so HK could do ABS scans.

JS BC



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST