[BLAST_SHIFTS] Shift summary 07/25/2003 Swing

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Jul 26 2003 - 00:11:06 EDT


Operators: franklin chris2 ----

18:30 started taking data D2 unpol 0.1sccm
19:35 ccr had trouble delivering beam, switched max current to 110 A
   took 4 runs: 1722-5
20:13 lowered the flow to 0.08 sccm
  in the middle of run 1729, the beam-gated scalers were all zeros
  caused by the trigger supervisor
  used 'Reset' and 'Cancel' buttons on CODA runcontrol panel
    instead of typing 'reset' in the terminal. worked fine.
23:29 lowered flow to 0.05 sccm



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST