Operators: franklin chris2 ----
18:30 started taking data D2 unpol 0.1sccm
19:35 ccr had trouble delivering beam, switched max current to 110 A
took 4 runs: 1722-5
20:13 lowered the flow to 0.08 sccm
in the middle of run 1729, the beam-gated scalers were all zeros
caused by the trigger supervisor
used 'Reset' and 'Cancel' buttons on CODA runcontrol panel
instead of typing 'reset' in the terminal. worked fine.
23:29 lowered flow to 0.05 sccm
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST