Operators: seely degrush nikolas
problems with the polarized source meant no beam until 8pm.
took polarzied H data (flipping beam fill-by-fill). took runs 1955-1959, all crunched.
around 11pm started warming nozzle and switched to unpolarized gas. (nozzle was clogging quickly)
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST