[BLAST_SHIFTS] Shift summary 08/17/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Aug 17 2003 - 08:03:45 EDT


Operators: zhangchi clasie yxiao

data taking

as covered in Yuan's summary, toward 4:00am. WCL6 trips even with 3500V. WCL21, WCR24 also trip repeatedly. Decide to stop data taking, turned off WC HV crates, beam and Blast Power Supply.

5:00am, ask CCR to ramp up Blast PS and start taking data again. WCL6 is brought back to 3800V.

WCHV generally hold. trip from time to time.

7:15, transmittor tripping. 7:30 beam back, 8:00 transmittor failure again

Chi, Ben, Yuan



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST