[BLAST_SHIFTS] Shift summary 08/26/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Tue Aug 26 2003 - 12:05:11 EDT


Operators: chris2 seely ----

ccr continued to tune the beam.
we took one run with empty target (2135), but the bqm's were still high (top:210), so doug is working with the tune



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:29 EST