[BLAST_SHIFTS] Shift summary 09/04/2003 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Sep 05 2003 - 00:25:28 EDT


Operators: chris2 seely ----

bill came in at 9:00 to do an atomic fraction measurement, but wasn't able to complete it due to 2 problems with the abs (O2 valve was left in local mode, and ABS V12 valve was stuck) it took most of the night to resolve these problems, and then just as we began to take data, we noticed the cell was too cold. finally at the end of shift we are ready to take data.