[BLAST_SHIFTS] Shift summary 10/02/2003 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Oct 02 2003 - 15:58:39 EDT


Operators: seely nikolas ----

Investigation of beam position continued. Further data on horizontal -1mm as well as vertical +1mm and -1mm have been taken. Analysis in progress.
L21 WC triped several times.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST