[BLAST_SHIFTS] Shift summary 10/04/2003 B (4-8)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Oct 04 2003 - 11:22:00 EDT


Operators: degrush ---- ----

Continued taking Unpol D2 for the remainder of the morning.

Handed beam back to CCR at the start of the shift since BQM Up was counting in the 400's and saw the wire chamber charging up. CCR was able to beat it down.

BQM: U 213, D=30 , L=44, R=26. With new slit positions Top=0.5,Bottom=-7,Left=-6,Right=16

Coda died a couple of times.

Took Runs 3063 3064 3066 3068

Started analyzing verttical bump data but ran into some questions and decided to let people sleep.

 



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST