Operators: yxiao yxiao ----
Made a hall access to check the cables of the neutron detector for ion-pol.
Then CCR got a RF unit problem.
At 2:00am started background study for ion-pol and made one measurement
w/o Blast field, w/o gas, and with slits out. During the process of filling gas and
collecting more date, got some Epics problem -- mysteriously some VME card
got a wrong ID, and there were some channel conflicting, though everthing
worked well several minutes ago. Tried to fix the problem, but failed.
Gave beam back to CCR; they're trying to make a more elegant tune.
Y.Xiao
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST