[BLAST_SHIFTS] Shift summary 12/07/2003 A (0-4)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Dec 07 2003 - 01:20:56 EST


Operators: franklin ---- ----

Shift has been spent recovering from power failure. Still unable to get South
Hall Ring RF on and can't get experts in due to storm. We do have beam
out of polarized injector. Ops will work on reestablishing linac tonight.
Transmitters still being restored.

No experimenters on shift until 8:00. Plan is for Genya to come in morning to
set up ABS and Defa Wang to get Ring RF going.