[BLAST_SHIFTS] Shift summary 12/19/2003 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Dec 20 2003 - 09:08:54 EST


Operators: seely seely seely

beam was taken around 7am for installation of BRP, so no data since then. currently all cpu's are crunching and there are two new runs 4126 and 4127 that need to be crunched. 12-8 shift (tavi) should pick up crunching with these two runs.

target is stable and detectors are in standby. hall will be open until at least noon, so i'm leaving. (called ET to let him know...also Bill Franklin is on site until at least noon - so someone is available if any problems come up). only thing next shift has to do to get running is open v14 and turn on detectors.

target:
 ligit 4e-9
6pole bottom 4.8e-7
6pole top 8.0e-7
nozzle temp: 70 K
cell temp: 103 K

js



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST