[BLAST_SHIFTS] Shift summary 02/17/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Feb 18 2004 - 00:10:30 EST


Operators: yxiao yxiao ----

Smooth data taking. Finished the plan Hauke gave in entry 19756,

---LADS backward off
runs 4830, 4831

---only Ohio wall right on
runs 4832, 4833

Then switched back to normal data taking after run 4835.
Good runs: 4935-4837. Run 4834 is junk.

WC L14 & L21 couldn't hold 3850V, so lowered to 3800V.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST