[BLAST_SHIFTS] Shift summary 03/15/2004 E (16-20)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Mar 15 2004 - 20:32:52 EST


Operators: alarcon adrian wangxu

Runs 5643, 5644, 5649, 5650, 5651 taken. Crunching.
Work on Compton and beam tuning took place between 1 and 5 PM.
We've been battling fierce WC L14 trips at 3750 V, but we've held our ground.

Nick will rest the WCs for an hour, WC L14 is becoming impossible.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST