[BLAST_SHIFTS] Shift summary 03/21/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Mar 22 2004 - 00:31:27 EST


Operators: egeis kohlm ----

Apologies for missing the 16-20 summary.

Things have been running smoothly since 4pm...

2 things:
------------------------
1) Transmitter 6 in CCR had a "crowbar"... but we were still able to take data on the beam until it was repaired and the next fill occured.
2) Ligit has been fluctuating ever so slightly, then there is a large peak (possibly corresponding to an ?air drop? from the frozen nozzle?-comments?) then everything is normal... This peak seems to occur every 2-2.5 hours. No other pressures change when this occurs.

Runs 5751-5757 are all taken and crunching...



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST