[BLAST_SHIFTS] Shift summary 03/26/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Mar 26 2004 - 16:09:26 EST


Operators: manouch manouch ----

"smooth" data taking, pol D2 runs. Took runs 5936-46, only 5938=junk
WC's are calm, no trips, only two trips on LADS
Karen and Doug changed the length of wire chamber signal going to the second level trigger. The background on WC signals now is more flat. The timing change occured during run 5939!
Crunching all runs taken so far.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST