[BLAST_SHIFTS] Shift summary 04/21/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Apr 21 2004 - 17:21:56 EDT


Operators: ---- ---- ----

Started with unpol target and learned that LADS HV was messed up due to data base change. We report the problem to Adrian and he is fixing it. Unpol gas gave us a problem - vaccuum pump trip and high BQM rate. and after fiddling with valves, Genja decided to change back to polarized H2. After the change of target, everything is running very smooth. Run 6841 and 6842 are crunching.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:30 EST