[BLAST_SHIFTS] Shift summary 05/04/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed May 05 2004 - 01:17:54 EDT


Operators: shino ---- ----

I took polarized deuterium target data for most of my shift. CODA and HV gui hang and I went to d-tunnel each time.

HV trips at LADS L15_R7 up is observed three times while WC R24 tripped twice during my shift.

One of the ABS pump (ABS4) failed before 0:00 am and we had to switch to empty target.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST