[BLAST_SHIFTS] Shift summary 05/06/2004 F (20-24)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri May 07 2004 - 00:42:56 EDT


Operators: tavi ---- ----

Beam available at 7pm (when Genya was done with the target),
(ABS D2, 50sccm, D_flip_3_state)
good runs: 7219 7221-7223
run 7218 could not be crunched after event 10001 .........
SH access around 10:30pm per Genya's request (tuning SFT).
While on shift monitor the SFT voltages (while SFT is ON):
forward ~9.5V
reverse ~3.5V
ratio ~0.33V
VCO ~6.75V
If they are not like these, call Genya.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST