[BLAST_SHIFTS] Shift summary 05/07/2004 D (12-16)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri May 07 2004 - 17:04:57 EDT


Operators: baris ---- ----

It was a pretty smooth shift. Beam current max. raised to 110mA from 100mA. Event size reduced to 150K for each run due to long crunching. Good runs, 7236-7237 7239-7243, were submitted to spuds for crunching and runlist was updated. Bill and Taylan accessed to SH for compton polarimeter(elog23714).



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST