Re: [BLAST_SHIFTS] Shift summary 05/11/2004 F (20-24)

From: Manouch Farkhondeh (manouch@mit.edu)
Date: Wed May 12 2004 - 07:06:31 EDT


HI:
It would be nice if people on shift generating the shift summary elog
report to fill in the appropriate boxes on te form so we know who was on
the shift. Or to put down their name or initials.
Manouchehr

Electronic Log Book wrote:
>
> Operators: ---- ---- ----
>
> Unpol data continued after Bill postponed spin-flipper work.
> Originally data taking was hindered by lots of tripping and bad BQMs both of which improved over time. Going to lower injection current helped.
> After idling for an hour because of a transmitter 6 trip, the WC were quiet and allowed higher injection to 100mA.
> runs: 7381-7391