[BLAST_SHIFTS] Shift summary 05/15/2004 C (8-12)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun May 16 2004 - 01:05:52 EDT


Operators: ajmasch ---- ----

genya successfully got the abs setup for deuterium. ccr tuned the beam for a while. data taking started at 9:00 and continued unfettered until the end of the shift. not enough statistics crunched, though, to make polarization measurements.

good pol deut runs:

7453-7460 7462-7464



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST