[BLAST_SHIFTS] Shift summary 05/28/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat May 29 2004 - 00:37:08 EDT


Operator: akdogan

During this shift period we had only 3-4 hours of beam time.

At 8pm, CCR had problem with communicating to the IOC
controlling the quads. Then, other related problems appeared.
Injection was not possible during this time.

They let the beam in the ring for about 3-4 hours, meanwhile the
experts came in and fixed all the problems. The beam came at 12:30am.

--- o ---

During the first 4 hours took Polarized D2 data: Runs 7893-7898 are crunched/being-crunched.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST