[BLAST_SHIFTS] Shift summary 06/03/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Jun 03 2004 - 09:27:27 EDT


Operator: zhangchi

ABS problem fixed already when arrived to shift. took D2 polarized data.

in the middle of run 8078, beam current increased to 150mA.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST