[BLAST_SHIFTS] Shift summary 06/05/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Jun 05 2004 - 16:59:22 EDT


Operator: baris

Smooth running. Kept accumulating ABS D2 data. CCR delivered the beam continously. CODA hung thrice. HV tripped time to time.

Runs for this shift: 8153-8154 8156 8158-8163 8165-8169

Baris



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST