Operator: akdogan
Beam: CCR tuned the beam until around midnight. We will switch to production
beam shortly. So, we didin't have any data yet.
Target: Genya left ABS off. We just turned on the unpol D2 system.
Compton: Made an initial scan of laser and collimator during the final
stages of beam tune (before I leave). Ready to go.
DAQ: Loaded physics trigger (and verified), restarted coda, and
configured l2trig. Ready to go.
This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST