[BLAST_SHIFTS] Shift summary 06/29/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Jun 30 2004 - 03:13:34 EDT


Operator: karpiusp

Took UNPOL H2 runs with buf ~ 1.5 Torr

Compton CsI reading ~862

Early in shift EI had phoned CCr and told them V14 was closed. They ramped the holding field down to 200 Amps and I opened V14, hf back up - does this thing close on its own?

CCR also said that the BRP tripped at 23:03 - (are we using this??)

At one point CCR could not inject and took the beam to make adjustments. 130mA seemed to be max allow. injection

All runs crunching through 8379



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST