[BLAST_SHIFTS] Shift summary 07/14/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Jul 15 2004 - 00:43:39 EDT


Operator: tavi

Started taking Unpol D2 at around 22:30;
runs taken so far: 8890-8892 8894 (each takes ~30min).
BATS are On, downloaded newphys_kd_BATS.settings ( I also called Michael to check with him about BATS and trigger).
Beam injected @ 150mA.
Smooth



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST