[BLAST_SHIFTS] Shift summary 08/16/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Aug 16 2004 - 15:55:38 EDT


Operator: tong

We had very smooth data taking.
Beam was stopped for an hour for optimizing the beam polarization at noon.
CCR reset the quads and now polarization is about 60%+-3%.
Instead of spending more time to increase the beam polarization,
the run coordinator decided to take data with what we have now.
Since 1:30, we are in normal data taking mode.