[BLAST_SHIFTS] Shift summary 08/20/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Aug 20 2004 - 16:00:31 EDT


Operator: vziskin

Very easy shift until, what is by many accounts a power glitch knocked out blast, and holding fields at around 15:30.
Looks like we lost the remaining pumps on the nozzle. I think that it will a while.

Good runs 10207-10212, 10214-10221, 10223-10224, power failier during run 10224.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST