[BLAST_SHIFTS] Shift summary 08/22/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Aug 22 2004 - 16:56:36 EDT


Operator: clasie

Continued ABS pol D data taking until ligit dropped below 4.5e-8 Torr. Then at close to 1pm Ernie walked me through starting the ABS nozzle regeneration. The nozzle warmed up for the rest of the shift while taking empty target data.

There were no signals in the 15cm LADS tdc's and adc's in the online GUI. Karen worked out that the TDC module was probably not functioning and rebooting the RHS fastbus crate solved this problem. Runs 10268-10297 do not have LADS 15cm TDCs.

Taylan solved the problem with the Compton GUI not updating the run number. The Compton data is ok from previous runs. There were two Compton processes running at the same time, see elog 28003.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST