[BLAST_SHIFTS] Shift summary 08/23/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Aug 23 2004 - 08:31:13 EDT


Operator: vziskin

Easy going until 5:30 when the network switch failed. Could not take data untill 7:50 when Barbara replaced the switch. She only had 12 channel one and the one we need is 24 channel. So, as a consequence there is currently no wireless in the counting bay. Some other computers might also be effected. However, dblast07, dblast09 and dblast10 are ok. Beam quality is resonable, no high voltage trip what so ever. Looking at the vertex I can see that the background is somewhat higher than usual.
Good runs are 10321-10327 10329-10330 10333-10334