[BLAST_SHIFTS] Shift summary 08/24/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Wed Aug 25 2004 - 01:04:35 EDT


Operator: karpiusp

No beam all shift. CCR put beam in the ring late in the shift but is still optimizing it.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST