[BLAST_SHIFTS] Shift summary 08/29/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sun Aug 29 2004 - 16:48:25 EDT


Operator: hasell

Broken wires in R15 replaced.

Initially R15 tripped a couple of times (new sense wire needed to be conditioned). Now verything is very quiet; including R24 which is back to 3850 V.

At one point the criuncher daemon hung and when unnoticed for several runs. Consequently crunching has fallen behind and now several jobs will end almost simmultaneously.

Otherwise verything went very smoothly.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST