[BLAST_SHIFTS] Shift summary 09/03/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Fri Sep 03 2004 - 09:22:45 EDT


Operator: kohlm

Running pol D2 without problems until 05:30, when the left slit got stuck.
CCR called in a tech to fix it. Beam is back by 09:00

Some ABS alarms while we are down, in particular BTranAlarm

Good runs 10796-10799 10801-10807
Bad runs 10800 10808-10810

pol.log updated. Crunching of runs 10740 and 10751 restarted.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST