[BLAST_SHIFTS] daily meeting

From: Michael Kohl (kohlm@mit.edu)
Date: Wed Sep 08 2004 - 15:19:52 EDT


Snakes have been filled; transmitter 5 has been fixed. Still some problem
with septum stepper motor. Wire chambers were leak-tested.

ABS is ready for pol D2.

Automated ring fill software has been updated to provide some overlap
between ramping voltages and moving slits.

Jan will take some time to study lifetime.

After beam is ready, pol D2 running will continue.

Only (or still) two shifts are left open for this week:
Fri 1-9 A, Sat 9-17 B. Please sign in.

Regards,

    Michael

-- 

+-------------------------------------+--------------------------+ | Office: | Home: | |-------------------------------------|--------------------------| | Dr. Michael Kohl | Michael Kohl | | Laboratory for Nuclear Science | 5 Ibbetson Street | | MIT-Bates Linear Accelerator Center | Somerville, MA 02143 | | Middleton, MA 01949 | U.S.A. | | U.S.A. | | | - - - - - - - - - - - - | - - - - - - - - -| | Email: kohlm@mit.edu | K.Michael.Kohl@gmx.de | | Work: +1-617-253-9207 | Home: +1-617-629-3147 | | Fax: +1-617-253-9599 | Mobile: +1-978-580-4190 | | http://blast.lns.mit.edu | | +-------------------------------------+--------------------------+



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST