Operator: hasell

Auto-cruncher hung at beginning of shift. Re-started it.

Around 20:00 CCR lost a transmitter. Took 20 minutes to get it back. In that time cell temp dropped to 90 deg. Once beam back temp returned to ~100 deg.

During run 11527 ROC hung and needed a reboot. Added 11527 to auto-cruncher by hand.

run 11529 last run with polarised D2 for tonight. Called Genya and he explained how to turn of RF, and close valves. Called CCR for controlled access to turn off cryo-pumps to nozzle and sextapole.

Run 11530 first run with empty target cell.