[BLAST_SHIFTS] Shift summary 10/07/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Thu Oct 07 2004 - 09:18:32 EDT


Operator: zwart

Uneventful run

TX 5 tripped. RF group came in and reset/repaired the fault.

peak current has been reduced from 165 to 150 mA - possible problems injecting yesterday? Did not try to increse peak current on the night shift.

Good runs:

11743,11745-11749



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST