[BLAST_SHIFTS] Shift summary 10/09/2004 A (1-9)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Oct 09 2004 - 09:03:31 EDT


Operator: shino

There were two abrupt stops due to a beam adjusting problem or something. The beam is just all right now,

I noticed that there are three crashed runs listed in the cruncher recently. I hope this is just a coincident.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST