[BLAST_SHIFTS] Shift summary 10/15/2004 C (17-1)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Sat Oct 16 2004 - 00:54:37 EDT


Operator: akdogan

Nothing much to report.

Continued to take ABS-D2 data.

Good Runs: 11943 11945-11950

At about 9pm, CCR had some stability issues that resulted a few bad fills,
as a result the injection current is reduced to 140mA, which is holding
fine for the last two hours (see elog 30205).

Overall, it was an efficient shift with very minor beam interruptions.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:31 EST