[BLAST_SHIFTS] Shift summary 11/15/2004 B (9-17)

From: Electronic Log Book (elog@blast05.lns.mit.edu)
Date: Mon Nov 15 2004 - 16:56:02 EST


Operator: wangxu

In this shift, we mainly took empty runs since ABS nozzle needs to be regenerated. Injection beam current was around 165 mA.



This archive was generated by hypermail 2.1.2 : Mon Feb 24 2014 - 14:07:32 EST