Daily meeting:
- Hall was open during day; Snake-fill was done
- Hall is secured and got the beam in the ring at 3pm
- Started ABS-H data
- Overnight beam polarization was 68-69% (back to where it was
before Monday morning)
- On friday, when Genya regenerates the nozzle, a few paralel
jobs will be performed: recesiation for polarized beam source
and Pcirc measurement at the end of the line.
Run plan:
- More of the same: Take ABS-H data. Pay attention to the
run-check-list, and update the runlist and pol.log files as
needed.
-- ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=--- Taylan Akdogan Massachusetts Institute of Technology akdogan@mit.edu Department of Physics Phn:+1-617-258-0801 Laboratory for Nuclear Science Fax:+1-617-258-5440 Room 26-402b ---=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=---